Free original lessons
Contour Bunds Drawing: Earthwork Cross-Section Skills
Learn to draw contour bunds as earthwork cross-sections with labeled slope, berm, and channel features using a defined drawing convention and checkable arithmetic.
Free lesson
Four exercises
Worked answers
Object Drawing Lessons
This lesson teaches how to represent contour bunds as an earthwork cross-section, not as a landscape map or perspective view. You will use a simple drawing convention: horizontal ground line, vertical height scale, and labeled slope and berm features. All numerical values are hypothetical examples for practice; measure your own equipment and label any chosen values clearly. The goal is a clear, checkable section drawing that communicates earthwork shape and dimensions.
Practice materials: Printable downloads are not available for this lesson yet. Use the instructions and four exercises below.
Defining the cross-section convention
A contour bund cross-section shows a slice through the bund perpendicular to its length. Use a horizontal baseline for original ground, a vertical axis for height, and a consistent scale such as 1 cm = 10 cm (hypothetical). Draw the bund as a trapezoid with a flat top (berm), side slopes, and a small channel or toe line where specified. Label slope ratio as horizontal:vertical, for example 2:1. Keep all units in centimeters or meters and state them on the drawing.
Lettering and line style follow a simple convention: solid lines for earthwork edges, dashed lines for original ground where covered, and clear labels placed outside the section. X-height is baseline to midline; letter styles vary, so use any legible style that meets the rubric. Valid alternatives include left-to-right or right-to-left slope orientation, provided labels match.
- Draw a horizontal ground line and mark the vertical scale.
- Sketch the bund trapezoid with berm width and side slopes.
- Add channel or toe line if required by the brief.
- Label slope ratio, berm width, and height with units.
Measuring and scaling the section
Before drawing, measure the actual equipment or site feature you are representing, or use clearly labeled hypothetical values. For example, a berm width of 30 cm and height of 20 cm with 2:1 slopes gives a horizontal run of 40 cm per side (2 × 20 cm). Check arithmetic: total base width = berm + 2 × run = 30 + 80 = 110 cm. Keep units consistent and write them on the drawing.
Scale choice must be stated. If 1 cm on paper represents 10 cm on ground, then 110 cm base becomes 11 cm on paper. Verify by dividing each real dimension by the scale factor. Do not invent printer tolerances; measure your ruler and paper, and label any chosen scale as a hypothetical example.
- Record real or hypothetical dimensions with units.
- Compute horizontal run from slope ratio and height.
- Choose a stated scale and convert dimensions.
- Check converted lengths with simple division.
Labeling slope and berm features
Labels must be unambiguous. Place slope ratio labels along the sloped edges, berm width across the flat top, and height as a vertical dimension line. If a channel is shown, label its depth and width separately. Use arrows or leader lines that do not cross the section. Valid alternatives include labeling on either side, as long as each label clearly points to its feature.
The rubric rewards consistency: every dimension has a unit, every slope ratio matches the drawn run, and the berm is visibly flat. A common mistake is drawing a slope ratio that does not match the horizontal run; check by multiplying height by the first number of the ratio and comparing to the drawn run.
- Place slope labels along sloped edges.
- Label berm width across the flat top.
- Add height dimension with units.
- Verify each slope ratio against drawn run.
Checking the drawing against arithmetic
Use simple arithmetic to check the section. For a bund with height h, berm b, and slope ratio s:1, base width = b + 2 × s × h. If h = 20 cm, b = 30 cm, s = 2, base = 30 + 80 = 110 cm. On paper at 1:10, base should be 11 cm. Measure your drawing and compare. If it differs, adjust the drawing or the stated scale, not the arithmetic.
Also check that the berm is horizontal and the two slopes are symmetric unless the brief states otherwise. Valid alternatives include asymmetric slopes if labeled, but the arithmetic must still match each side separately. Record your check method on the drawing or in a note.
- Compute base width from formula.
- Convert to paper length using stated scale.
- Measure drawn base and compare.
- Adjust drawing or scale and recheck.
Worked example
Draw a contour bund cross-section with height 15 cm, berm width 25 cm, and 3:1 slopes. Use scale 1 cm = 5 cm (hypothetical). Label all features and show a check.
Worked answer
Horizontal run per side = 3 × 15 = 45 cm. Base width = 25 + 2 × 45 = 115 cm. At 1:5 scale, paper base = 115 ÷ 5 = 23 cm; berm = 5 cm; height = 3 cm; each run = 9 cm. Draw horizontal ground line, trapezoid with flat 5 cm berm, 3 cm height, 9 cm runs each side, label 3:1 slopes, 25 cm berm, 15 cm height, and state scale 1:5. Check: 5 + 9 + 9 = 23 cm drawn base.
Four practice exercises
Exercise 1
Draw a section with height 10 cm, berm 20 cm, slopes 2:1, scale 1 cm = 2 cm (hypothetical). Label and check.
Show answer and check
Run per side = 20 cm; base = 20 + 40 = 60 cm; paper: height 5 cm, berm 10 cm, runs 10 cm each, base 30 cm.
Why: Use base = berm + 2 × slope × height = 20 + 2 × 2 × 10 = 60 cm; divide by scale 2 to get paper lengths.
Check: Measure drawn base; should be 10 + 10 + 10 = 30 cm.
Exercise 2
Draw a section with height 12 cm, berm 18 cm, slopes 1.5:1, scale 1 cm = 3 cm (hypothetical). Label and check.
Show answer and check
Run per side = 18 cm; base = 18 + 36 = 54 cm; paper: height 4 cm, berm 6 cm, runs 6 cm each, base 18 cm.
Why: 1.5 × 12 = 18 cm run; base = 18 + 2 × 18 = 54 cm; divide by 3.
Check: Drawn base should equal 6 + 6 + 6 = 18 cm.
Exercise 3
Draw an asymmetric section: left slope 2:1, right slope 3:1, height 10 cm, berm 15 cm, scale 1 cm = 5 cm (hypothetical). Label and check.
Show answer and check
Left run = 20 cm, right run = 30 cm; base = 15 + 20 + 30 = 65 cm; paper: height 2 cm, berm 3 cm, left run 4 cm, right run 6 cm, base 13 cm.
Why: Compute each run separately; sum with berm; divide by scale.
Check: Drawn base should be 3 + 4 + 6 = 13 cm.
Exercise 4
Draw a section with height 8 cm, berm 24 cm, slopes 2.5:1, scale 1 cm = 4 cm (hypothetical). Add a toe line 2 cm beyond each slope base and label. Check main section.
Show answer and check
Run per side = 20 cm; base = 24 + 40 = 64 cm; paper: height 2 cm, berm 6 cm, runs 5 cm each, base 16 cm; toe line extends 0.5 cm each side on paper.
Why: 2.5 × 8 = 20 cm run; base = 24 + 40 = 64 cm; divide by 4; toe extension 2 ÷ 4 = 0.5 cm.
Check: Main drawn base should be 6 + 5 + 5 = 16 cm; toe line adds 0.5 cm each side.
Common mistakes
- Drawing a perspective view instead of a cross-section. Use a flat slice with horizontal ground line and vertical height axis; no vanishing lines.
- Slope ratio does not match drawn horizontal run. Multiply height by the first ratio number and compare to drawn run; redraw or relabel.
- Missing units on dimensions. Write cm or m after every number and state the scale.
- Berm drawn as sloped rather than flat. Make the top a horizontal line and label its width.
Self-check rubric
- Cross-section convention followed: horizontal ground line, vertical height axis, no perspective.
- Berm drawn flat and labeled with width and units.
- Slope ratios labeled and consistent with drawn horizontal runs.
- Height dimension labeled with units.
- Scale stated and converted lengths checkable by arithmetic.
- Labels clear and non-crossing; valid orientation alternatives accepted.
Questions and answers
Can I draw the bund facing left instead of right?
Yes. Orientation is a valid alternative if labels match the features and arithmetic checks hold.
Do I need a channel in every section?
Only if the brief requires it. If shown, label depth and width separately with units.
What scale should I use?
Choose any stated scale, label it as a hypothetical example, and verify converted lengths by division.
How do I check my drawing quickly?
Compute base width = berm + 2 × slope × height, convert by scale, and measure the drawn base.